COMPANY BUSINESSES
Reclaimed Water and Sewage Pipeline Project for Donggao Road and Other 7 Roadsin Chaoyang District of...
The reclaimed water and sewage pipeline project has been carried out for 7 roads in Chaoyang District, which are respectively Donggao Road, Magezhuang Road, Gaoantun 6th Road, Gaoantun 2nd Road, Bahenan Riverside Road, Gaoantun 1st Road, and Gaoantun 8th Road. And new pipelines for reclaimed water and sewage including recession) have been constructed along the 7 roads. Among them, the reclaimed water pipeline starts from Gaoantun Reclaimed Waterworks and ends at Dongbanan 2nd Street with the pipe...
Viaduct of Subway Line 14 of Beijing
The Subway Line 14 of Beijing is an L-shaped trunk line under the rail transit network of Beijing, extending from northeast to southwest. It is totally 47.7 kilometers long. The elevated line is 4.73 kilometers long. From the start, it extends along the central line of Meishikou Road, crossing the Xiaolaba River, the Yongding River, the West 5th Ring Road and a number of planned intersections. It passes through the Beijing-Shijiazhuang Passenger Railway and the Fengtai District-Shacheng Station R...
Waterlogging Control Project of Concave-Down Bridge Areas in Beijing Central City
Our company has been taking up waterlogging control projects of concave-down bridge areas in Beijing central city since 2012 and we have undertaken the upgrading and reconstruction projects of the concave-down bridge areas and reservoirs of 21 bridges, such as Xiaojiahe Bridge, Gongyi East Bridge, Dahongmeng Bridge in Haidian District and Fengtai District of Beijing. In view of construction engineering land shortage and construction difficulty, the subsurface excavation method for reservoir const...
Beijing Subway Line 5 viaduct
Beijing Subway Line 5 runs through Dongdan and extends southwards to Songjiazhuang, and northwards to Taipingzhuang. It is the first south-north subway line of Beijing. The project measures 27.6km long and establishes 24 stations, 15 underground stations and 9 elevated stations. The underground section measures 14.8km and the ground section and elevated section 12.8km. Beijing Subway Line 5 is the Olympic project, with most part locating at the center of the trunk roads. The project is characteri...
First-Stage Light Rail(to the new railway station), a New Transport System in Astana
The first-stage project of light rail in Astana starts from Astana International Airport and ends at the new railway station, with the overpasses in between being as long as 21.39 kilometers and the length of overpasses on the entrance and exit section lines totaling 537.313 meters. With 18 overpass stations built and the International Airport 101 Station as the starting point, the light rail has been laid all the way from Kabanbay - south side(a green belt)of Section A of Bader Street to the...
Angola Luanda Nova Centralidade de Cacuaco Project
The project in Cacuaco area of Luanda is a municipal supporting work for Angolan Luanda Nova Centralidade de Cacuaco. In long term, 30,000 residential apartments will be built, which can accommodate a total population of 210,000.In short term, 12,000 will be built, which can accommodate total population of 120,000.
Sewage Treatment PlantThe production capacity of the sewage treatment plant is 40,000 m³/d. Some tail water after two-stage biological treatment is discharged into natural ditch on ...
Reclaimed Water and Sewage Pipeline Project for Shuangqiao East Road and other 7 Roads
The reclaimed water and sewage pipeline project has been carried out for 7 roads, including Shuangqiao East Road, Heihuzhuang Street, Changying Road, Daludian North Road, Tonghuiguanqu West Road. And new pipelines for reclaimed water and sewage (including recession) have been constructed along the 7 roads. Among them, the reclaimed water pipeline starts from Dingfuzhuang Reclaimed Waterworks and ends at the south side of Fatou Sewage Treatment Plant with the pipeline length of 7468.7m and pipe di...
New Transfer Passageway Works for Shaoyaoju Subway Station of Beijing City
As a transfer station for Metro Lines 10 and 13 in Beijing, new transfer passageway crossing the ground hall and the overpass has been built to solve the serious congestion of the existing underground transfer passageway. The works involves the construction of transfer flyover with its length of 87m and width of 5.48m, the reconstruction of the northwest entrance of the station at Line 10 with the renovated area up to 869m², and the renovation of 322m² station and add-on escalator of platform b...
Lianyungang BRT Line 1
Starting from Haizhou Passenger Station in Haizhou District, Lianyungang BRT Line 1, passing Xingfu Road, Hailian Road, Xingangcheng Avenue, Zhongshan Road and Haitang Road and ending at Zaihai Yifang in Lianyun District, measures 33.1km in length and establishes 27 pairs of stops. The project includes feasibility research, design plan and construction drawing design. Upon the completion of BRT Line 1, the interruption of traffic access/exit have little influence to the exclusive lane. BRT enjoys...
Design Consulting