COMPANY BUSINESSES
Municipal Project in Chengde Airport Economic Zone (West)
The project includes the design of municipal roads, heat supply pipelines, rainwater pipelines, sewage pipelines, water supply pipelines, natural gas pipelines, power supply pipelines and communication pipelines. In particular, the heat supply pipeline network adopts the form of closed double pipelines. Heat supply pipelines are laid along Weisan Road, Jingshiwu Road, Weiliu Road, Jingsan Road, Weiba Road and Jingyi Road, which form a main circular pipeline network in the start-up area. The heat ...
Design of Regional Energy Plan for Longhu Financial Center, Zhengdong New District
The plan & design maximizes the development and utilization of energy. The most appropriate energy plan was worked out. It aims to reach the domestic advanced level in such indexes as total energy consumption, carbon dioxide emission and economical efficiency. In the financial center, an energy supply system that features distributed combined regional cold-heat-power supply will be finally built, which fully develops and utilizes low-carbon transportation and renewable energy.
Unit Plan & Upgrading Plan for Anqing Economic and Technological Development Zone’s Laofeng Area
The planned land totals 22.44 square kilometers, and the current-construction land totals about 512.25 hectares. Specifically, the approved construction land totals about 177.01 hectares, mostly for new-energy vehicles, Changfeng shantytown settlement, Phase III of the resettlement site of the casting & forging industrial park, Phase I of Laofeng resettlement site, Lucky Logistics and the bonded logistics center.
Beijing Tuqiao Depot’s Boiler Renovation Project
The boiler room covers a gross floor area of 1,004.65 square meters. The frame structure includes a boiler room, a heat exchange room, a soft water deaeration room, an instrument control room, etc. The heating area is 139,000 m2, the total heating load is 14.52 MW, the domestic hot water load is 1.86 MW, and the design temperature of supply & return water is 95℃-70℃. All heating loads of the heating system are provided by three 5.6 MW hot water boilers, and the heating loads of the domestic h...