Beijing Daxing International Airport Express
Beijing Daxing International Airport Express starts from the new airport in Beijing and ends at Caoqiao. It is planned to build the North Terminal Station. The line will comprise Cigezhuang Station, Caoqiao Station, North Terminal Station and a depot, with approximately 41-36 km in total length. It was designed as a rapid and through-service one. The high-quality rail transit line, which passes through Fengtai and Daxing Districts, connects the central urban area with Beijing's new airport. It pr...
Part B of the PPP Project — Kunming Rail Transit Line 4
Kunming Rail Transit Line 4 runs from northwest to southeast, with a total length of 43 km. It passes through Panlong District, Wuhua District, Guandu District and Chenggong District. There are 29 stations along the line, all of which are underground stations, with an average inter-station spacing of 1.54 km. The line is an industrial auxiliary axis that connects the major industrial bases of Kunming. It is the longest metro line under construction in the city and also the one with the largest pa...
PPP Project — Chongqing Rail Transit Bitong Line
The Bitong Line starts at West Tongliang Station, passes through Tongliang Station, Tongliang New Town Station, Pulyu Station, Dalu Station, Qinglonghu Station, Hebian Station and Daishan Avenue Station, and ends at Bishan Station in Bishan District. The line, 37.5 km long, encompasses 9 stations, including 3 elevated stations and 6 at-grade stations. With a bridge-to-tunnel ratio of 70%, the 5.8-km-long Yunwushan Tunnel serves as a critical project for the entire line.
PPP Project — Shaoxing Rail Transit Line 1
The Shaoxing Metro Line 1 is a provincial key project and a supporting project for the Asian Games Hangzhou 2022. It consists of the main line and the branch line. The main line starts at China Textile City Station and ends at Fangquan Station, while the branch line starts at Exhibition and Convention Center Station and ends at Huangjiu Town Station. There are 23 stations on the entire 34.1-km-long line, including 22 underground stations and one at-grade station. With the estimated budget of 23.8...
Zhuzhou ART Phase I Project
Stretching 11.5 km from Hunan University of Technology Station to Xiangyang Plaza Station, the project comprises 15 stations. It connects key points across the eastern and western parts of Zhuzhou, serving the city's cultural, administrative, and commercial hubs. The project is a key urban rail trunk line that connects the east and west of Zhuzhou and the outside world. The intelligent rail transit system represents a new rail transit mode with medium‑to‑low capacity, integrating autonomous s...
PPP Project — Outer Ring North Road, Anqing
Situated in northeastern Anqing, the project extends 14.93 km from the new Airport Avenue exit on the Hefei-Anqing Expressway in the west to Wanjiang Avenue in the east. It features 12 bridges and 43 culverts along the alignment, with a bridge‑to-tunnel ratio of 28.68% and a designed speed of 60 km/h. As a key project in Anqing, this urban trunk road is the longest, largest, and highest-investment project in the city's road construction history. It fundamentally ends Anqing's long‑standing ab...
PPP Infrastructure Project for East Huangshan International Town
Situated in Tanjiaqiao Town, Huangshan District, Huangshan City, Anhui Province, the East Huangshan International Town includes three clusters – North, South, and East – and will ultimately adopt a layout featuring a ring road and three core areas. As the internal road network of the East Huangshan International Town, this PPP infrastructure project is a major initiative for the town's development. It comprises 9 trunk roads and 11 secondary trunk roads (including underground water and draina...
PPP Project — Middle Section of Airport Avenue, Dianzhong New Area
Located between the north-south growth corridors of Yunnan's Dianzhong New Area, the project crosses the Airport Economic Zone and Yanglin Town in Songming County. Stretching 9.45 km with a 65m right‑of‑way width, this urban trunk road features a separate main and auxiliary lane configuration. The main lane is designed as an eight‑lane bidirectional carriageway. An underground utility tunnel is laid along the road, with a total length of 7.5 kilometers. The project covers the construction o...
PPP Mode