COMPANY BUSINESSES

Nanjing Metro Line 2 Eastwards Extension Viaduct (U-shaped Girder)

In order to meet the requirement on landscape and environmental protection of Xianlin Avenue, the viaduct along Xianlin Avenue of Nanjing Metro Line 2 eastwards extension adopts the open thin-wall U-shaped girder as the upper structure and it is the first of its kind in China. The U-shaped girder span is 25m. The distance from Xianhemen to Xianhezhong Station is 1.2km and the distance between the two U-shaped girders from Xianhedong to Tiyuxueyuan is about 3.5km. This project is the first one to ...

Beijing Modern Tram Xijiao Line Viaduct

Beijing Modern Tram Xijiao Line is a dedicated rail transit lit connecting the urban area with the Fragrant Hill, paved along Xiangshan Road, Hanhe Road, Yuquan Country Park, south side of Nanjie Street of Beiwu Village, west to Jinhe Road, South-to-North Water Division Park, the North Fourth Ring Road West Street and Kunyu River from west to east, and finally reaches Bagou for transfer with the existing Subway Line 10 at Bagou Station. The line measures 9.064km long. This is a low traffic volume...

Beijing Rail Transit Capital Airport Line viaduct

The Airport Express Line Project of Beijing Rail Transit starts from the tunnel exit and ends at the greenbelt of the viaduct of Wuyuan Bridge between the expressway and Jingshun Road, measuring 3.733km and 123 strides. It crosses Xibahe, main bridge and ramp of Siyuan Bridge, Jiangtai Road, Wanhong West Street and Wangjing Street, and the contacting ramp of the two airport expressways and Jingshun Road. The interchange of Siyuan Bridge is three-story directional interchange. The standard girder ...

Viaduct of Changping line of Beijing subway

The Changping line of Beijing subway is totally 30.88 kilometers long. It consists of two sections. One section is from the Nanshao Station to Xi’ erqi Station, totally 21.35 kilometers long (2.99 kilometers underground, 2.82 kilometers on the ground, and a viaduct that is about 15.54 kilometers long). There are seven stations, including one underground station, six stations on the viaduct and one depot at Dingsi Road.Viaduct at this section adopts 30m crossing twin-box single room box girder a...

Public Transport Transfer Center Works of Longhu Financial Center in Zhengdong New Area

Longhu Financial Center is located in an islet at the center of Tuanlong Lake in Longhu Group of Zhengdong New Area. To guide public transport, 4 public transport transfer centers (1 master transfer center and 3 auxiliary transfer centers) have been planned to be constructed around the island. At Jiuru Road master transfer center, a multi-storied public transport system including bus rapid transit (BRT), normal bus transit (NBT) and itinerant buses is to be constructed, which can meet the transfe...

The Tongzhou-Beiyuan P&R parking building project

The parking building project is located at the northwest side of the Tongzhou-Beiyuan Station of the Batong Line. Covering a land area of 4,292 square meters, the project is based on the original ground parking lot with 141 parking spaces. The parking building covers a total building area of 6,286 square meters. The multi-layer mechanical parking system covers a building area of 6,181 square meters, with plot ratio of 1.46 and greening rate of 7.6%. There are totally 297 parking spaces, including...

Guogongzhuang Public TransportCenter Works in Fengtai District of Beijing

The works is located between 4th Ring and 5th Rings in the southwest of Fengtai District, and to the southwest side of the subway train section of Guogongzhuang Station of Beijing Metro Line 9, covering a total area of 2.46 hectares with the total construction area up to 82,000 square meters. The main buildings include bus parking building and service rooms, maintenance workshops and underground parking garages. The bus center can accommodate 364 buses and 400 cars. As the first bus center with m...

Relocation of Zhuantang Maintenance Yard and Regional Dispatch Center Works of Hangzhou Public Transp...

The works is located at Zhuangtang Science & Technology Park of West Lake District in the southwest of Hangzhou city. The construction area is 34920 square meters (about 52.4 acres), and the planning floor area is 65,927 square meters (including 13,917 square meters of underground construction area). It serves as a dispatch and maintenance base for public transport area. In the base the single buildings are respectively regional dispatch center, maintenance workshop, combined building of two sing...

New Transfer Passageway Works at Xizhimen Station and Zhichunlu Station of Beijing Metro

The newly-built west-east transfer passageway works at Xizhimen Station of Beijing Metro is to realize the transfer between Metro Line 13 and Metro Line 2 as well as between Metro Line 13 and Metro Line 4, which is a key project of Beijing City. The newly-built underground passageway crosses the piles of Xizhimen Bridge, plate-covering rivers and the existing ring corridors in subway stations, as well as spans the stops inside subway stations and the space over track areas. Confronted with compli...