Changchun Beihu Rail Transit Line Phase-I Project

The project mainly connects the northern part of the central urban area and the northeastern area of Changchun. The Phase-I project has a total length of 13.22 kilometers.
The whole line of the Phase-I project adopts an overhead laying model. The upper structure adopts open thin-walled U-shaped beams, with beautiful appearance and good noise-reduction effects. It is the first U-shaped beam elevated system laid in the cold northeastern region in China, and the first U-shaped beam elevated system ...

Longyin Bridge in Longhu Area, Zhengdong New District, Zhengzhou City

The project includes bridge construction, lighting installation, bridge-deck drainage works and a river-crossing-pipeline utility tunnel. Bridge construction involves a vehicular bridge and landscape pedestrian bridges on both sides. The super-structure of the main bridge is a three-span equal-height continuous steel box girder. The design load of the bridge in the project is Grade -A, the basic anti-seismic intensity is 7 degree, the peak ground acceleration is 0.15 g, the design reference perio...

New Transportation System’s Light Rail Phase-I Project (Light Rail to New Railway Station Section) in Astana City

The project is the first rail transit elevated line in Kazakhstan. The project starts from the Astana International Airport and ends at the new railway station. The line passes the new urban area of Astana, with high requirements for landscape.
The standard beam adopts 30-meter prefabricated double-box single-room simply-supported small box girders, and the road-crossing section adopts large-span prestressed-concrete continuous box girders. The project spans the Ishim River and adopts a 155-mete...