COMPANY BUSINESSES

Beijing Subway Line Batong viaduct

Line Batong is the eastwards extension section of Beijing Subway Line 1, measuring 18.964 km with 7.911km long ground line, 11.053km long elevated line and the bridge area 97,266m2. This project is China’s first elevated rail transit project erected mainly with the prefabrication method and the design has taken full consideration to the advantages of coordination in the bridge construction of rail transit. Three prefabricated girder plants were arranged along the line and the upper and lower st...

Viaduct of Subway Line 14 of Beijing

The Subway Line 14 of Beijing is an L-shaped trunk line under the rail transit network of Beijing, extending from northeast to southwest. It is totally 47.7 kilometers long. The elevated line is 4.73 kilometers long. From the start, it extends along the central line of Meishikou Road, crossing the Xiaolaba River, the Yongding River, the West 5th Ring Road and a number of planned intersections. It passes through the Beijing-Shijiazhuang Passenger Railway and the Fengtai District-Shacheng Station R...

Beijing Subway Line 13 viaduct

Beijing Subway Line 13 starts from Xizhimen on the west, runs northwards along the west side of Beijing-Baotou Railway, then turns northwards at Liugezhuang crossing, connects with Wanghe Branch Line and ends at Dongzhimen, measuring 40.8km long. Bridges along the line measure 12,944m long and the bridge area 114,238m². This project is Beijing’s first subway with elevated section. With full consideration to the features of the rail transit bridge as the urban bridge, the design employs the cas...

Beijing Subway Line 5 viaduct

Beijing Subway Line 5 runs through Dongdan and extends southwards to Songjiazhuang, and northwards to Taipingzhuang. It is the first south-north subway line of Beijing. The project measures 27.6km long and establishes 24 stations, 15 underground stations and 9 elevated stations. The underground section measures 14.8km and the ground section and elevated section 12.8km. Beijing Subway Line 5 is the Olympic project, with most part locating at the center of the trunk roads. The project is characteri...

First-Stage Light Rail(to the new railway station), a New Transport System in Astana

The first-stage project of light rail in Astana starts from Astana International Airport and ends at the new railway station, with the overpasses in between being as long as 21.39 kilometers and the length of overpasses on the entrance and exit section lines totaling 537.313 meters. With 18 overpass stations built and the International Airport 101 Station as the starting point, the light rail has been laid all the way from Kabanbay - south side(a green belt)of Section A of Bader Street to the...

Angola Luanda Nova Centralidade de Cacuaco Project

The project in Cacuaco area of Luanda is a municipal supporting work for Angolan Luanda Nova Centralidade de Cacuaco. In long term, 30,000 residential apartments will be built, which can accommodate a total population of 210,000.In short term, 12,000 will be built, which can accommodate total population of 120,000.
Sewage Treatment PlantThe production capacity of the sewage treatment plant is 40,000 m³/d. Some tail water after two-stage biological treatment is discharged into natural ditch on ...

Reclaimed Water and Sewage Pipeline Project for Shuangqiao East Road and other 7 Roads

The reclaimed water and sewage pipeline project has been carried out for 7 roads, including Shuangqiao East Road, Heihuzhuang Street, Changying Road, Daludian North Road, Tonghuiguanqu West Road. And new pipelines for reclaimed water and sewage (including recession) have been constructed along the 7 roads. Among them, the reclaimed water pipeline starts from Dingfuzhuang Reclaimed Waterworks and ends at the south side of Fatou Sewage Treatment Plant with the pipeline length of 7468.7m and pipe di...

Reclaimed Water and Sewage Pipeline Project for Donggao Road and Other 7 Roadsin Chaoyang District of...

The reclaimed water and sewage pipeline project has been carried out for 7 roads in Chaoyang District, which are respectively Donggao Road, Magezhuang Road, Gaoantun 6th Road, Gaoantun 2nd Road, Bahenan Riverside Road, Gaoantun 1st Road, and Gaoantun 8th Road. And new pipelines for reclaimed water and sewage including recession) have been constructed along the 7 roads. Among them, the reclaimed water pipeline starts from Gaoantun Reclaimed Waterworks and ends at Dongbanan 2nd Street with the pipe...

Sewage Treatment and Trunk Project for Reclaimed Water of Beijing Central City

Beijing has launched four reclaimed water construction projects respectively at Dingfuzhuang, Huaifang, Gaoantun and Qinghe Phase II since 2013. Our institute has undertaken the design of sewage feeder trunk lines of reclaimed water plant and reclaimed water trunk project at Dingfuzhuang and Gaoantun. Among these projects, at Dingfuzhuang the pipe diameter of sewage trunk is D2000mm and the reclaimed water trunk is as long as DN1200mm, at Gaoantun the pipe diameter of sewage trunk is D2400mm and ...

TO BE A DESIGN-LEADING
INTEGRATED SERVICE PROVIDER FOR
URBAN CONSTRUCTION