COMPANY BUSINESSES
First-Stage Project of the Underground Pipe Racks for the Third-Stage Construction(Wangfujing)of ...
The project is located under the 40-meter red-line road at Wangfujing Street of Dongcheng District of Beijing. Started in the north at the designed starting point of the right line of the third-stage Metro Line 8, the project reaches the north side of the intersection of Dongdansantiao Street in the south. Using the subway dewatering engineering pilot tunnel as the main structure on east and west sides of Wangfujing Subway North Station, the project adopts the underground excavation method to ins...
Design of Section 2 of the First-Stage Project of the Comprehensive Pipe Racks in Jiamusi
The project is located at Jiangshan residential district of east Jiamusi, which is the biggest ever shantytown improvement project of Jiamusi with the biggest investment, with the total length of the comprehensive pipe racks being 5.75 kilometers. The project includes the subsidiary facilities construction and reconstruction for the pipe racks and along the line:The length of the pipe rack at Huagong Road is 1.15 kilometers;the length of the pipe rack at Lingdangmai Street is 1.10 kilometers;...
Design of Section 1 of the Underground Comprehensive Pipe Rack(the South Canal Section)of Shenyan...
The project is located in the major city area of Hunbei of Shenyang and is as long as about 12.6 kilometers. Section 1 starts from the green belt on the north side of the West Wenti Road by the South Canal and ends at the Youth Park and is as long as 4.52 kilometers. The shield construction method has been adopted for the project construction. The structure is a shield round structure with the internal diameter being 5.4 meters to form two parallel pipe racks. 29 nodal wells have been set up, and...
Comprehensive Pipe Rack at the CBD Sub-Center of Zhengdong New District
The pipe rack is situated under the side road on the outer side of the intermediate ring road of the CBD sub-center of Zhengdong New District, one that has been simultaneously constructed with the road. The main pipe rack is 3253.64 meters long and is laid out in a ringed form. The total length of tributary pipe racks is about 1335.4 meters long, with the number of tributary pipe racks reaching 36. Special-purpose pipe racks have been set up to connect the main pipe rack with the municipal energy...
Municipal Design Engineering for the Infrastructure Construction Project ( Hexi District ) of the Thi...
The project is situated in the Hexi District ( under third-stage construction, including Mingdu Road )east of Tianfu Avenue of the High-Tech Zone, west of South Kehua Road, north of Jincheng Avenue and south of Fucheng Avenue in Chengdu, Sichuan Province. It is a municipal infrastructure project(exclusive of the Central Green Axis Park) of about 92 hectares. The pipelines entering the pipe rack include power cables, communication pipeline, water supply pipeline, cooling pipeline, heating ...
Comprehensive Pipe Rack at Dayuan CBD Area of Chengdu
The planned land area for the project is approx. 1 square kilometer, with the overall floorage being 4.1 million square meters. The CBD area consists of office buildings, commercial buildings and apartments. The project effectively combines spaces of different functions, such as the underground traffic, commerce, landscape and municipal pipelines, through intensification and integration, thus breaking down rigid restraints from limited underground space resources and bringing about the maximizati...
Jingjia Highway Overpass Project of the New Campus of the Graduate School of the Chinese Academy of S...
The overpass is located on the east side of the Management Cadre Institute of the Chinese Academy of Sciences (CAS) on Huaifeng Highway, Huairou District, Beijing, spanning over Jingjia Highway, and the east and west campuses of Huairou Campus of the Graduate School of CAS. The planned Jingjia Highway is a Grade I highway, and the red line width 70m. The overpass span is 45+60+46.5+4.5(m), a half-through steel oblique arch bridge with uniform section. The girder height is 1.0m, top width 5.0m and...
Cross-river Footbridge of the Capital Medical University
Both sides of cross-river footbridge are located in the campus of the Capital Medical University. The main bridge spans over Liangshui River and the trunk roads along both sides of the river. The footbridge is an important channel connecting the south and north campuses of the Capital Medical University, ensuring the safety of students and teachers and facilitating management of the university. Located in a complicated environment, the project faced many constraints and high requirements of span,...
Nanfeng Road Overpass Project of Shahe University Park of Beijing
The Nanfeng Road Overpass of Shahe University Park of Beijing is located in Shahe University Park of Changping District, spanning over Nanfeng Road and crossing Subway Changping Line. The structure system, in the I-shaped layout horizontally, consists of the continuous steel box girder, double-column pier and pile foundation. It is an important channel connecting the east and west campus of the Central University of Finance and Economics and plays a significant role in protecting the safety of st...