General Contracting of the Engineering, Purchase and Construction (EPC) of New Roads and Combined Pip...

With Huangshan Development Investment Group Co., Ltd. as the contractor, the Project was started on January 11, 2017 and currently it is under construction. It is our company’s first EPC project of municipal roads and combined pipe gallery. Located in new urban area of Huangshan City, the project include the construction of 4 municipal roads with the total length up to about 5km and 2 combined pipe galleries with the total length up to about 3.4 km. And the contract amount of the Project is abo...

Traffic Connection Hub and Surrounding Municipal Supporting Works of Kaifeng North Railway Station

The owner of the Project owner is Kaifeng New Area Infrastructure Construction Investment Co., Ltd. The construction of the Project started in October of 2015 and completed in December of 2016. Located at Kaifeng North High-speed Rail (HSR) Station at Kaifeng New Area of Henan Province, the project is to construct traffic connection with railway station square as well as municipal infrastructure supporting engineering. Traffic connection and municipal supporting works are the two categories. And ...

Quanzhou Coastal Avenue Project

Quanzhou Coastal Avenue, an urban artery in the plan, is one of China’s several coastal tourism and leisure avenues. The project includes roads, bridges, water supply/drainage pipelines, landscape and forestation, wave wall renovation, design of the bridge for the watercourse linking the inner lake with the outer sea, and lots of soft foundation treatment work. Six landscape areas are planned to be built, namely, ecological wetland conservation zone, fashionable metropolitan leisure zone, recre...

Xiagezhuang Sewage Plant

First-Stage Beihu Rapid Rail Transit Line of Changchun

The Beihu Rapid Line of Changchun mainly connects the north of the central city and the city’s northeast. The first-stage projects is aimed at a total length of 13.22 kilometers with a total of 12 stations. The maximum distance between two stations is 2431.5 meters, while the minimum distance 607 meters, with the average station spacing being 1184.778 meters. The maximum longitudinal slope of the rapid line is 2.9%, while the minimum radius of the main line curve is 150 meters. The starting poi...

Suburban Railway from Southern 4th Ring Road to the South Railway Station of Zhengzhou

The suburban railway from the Southern 4th Ring Road to South Railway Station of Zhengzhou measures 31.7 kilometers in total, with the elevated line being 16.2 kilometers long or so and the number of overpass stations reaching 7. The whole line comprises 8 elevated sections, entrance and exit lines and 八-shaped lines. Prefabricated U-girder has been adopted as standard girder, with the length of the standard girder reaching 14.3 kilometers and the cast-in-place continuous beam measuring 1.9 kil...

Longhu Longyin Bridge Project of Zhengzhou Zhengdong New District

Longhu Longyin Bridge Project of Zhengzhou Zhengdong New District includes the bridge engineering, lighting engineering, bridge deck drainage engineering and composite cross-river pipe rack. The bridge engineering includes the vehicle bridge and the footbridges on both sides. The vehicle bridge span layout is 37+50+37m and the bridge is 45.5m wide. The layout of footbridges on both sides is 23.5+50+29.2m and the bridge is 7~12m wide. The upper structure of the main bridge is the three-span contin...

Chongqing Rail Transit Line 1 viaduct

Chongqing Rail Transit Line 1 (Shapingba section-University Town) measures about 20.708km, and the underground section is 6.954km long and the elevated section 13.644km. Located in the main area of Chongqing University Town, the elevated section uses U-shaped girder elevated structure to meet requirements on landscape, vibration and noise. In order to meet the requirements on spanning over the crossing and adapting to the double crossover area, the project takes a lead to use the U-shaped continu...

Longhu Longxing Bridge Projectof Zhengzhou Zhengdong New District

Longxing Bridge (the bridge of Ruyi East Road crossing Longhu Lake) Project includes the bridge engineering, road engineering, lighting engineering, deck drainage engineering and cross-river pipe rack. The right road way (directed to the island) measures 205.373m long and the bridge section 158m and road section 47.374m; the left road way (direction of leaving the island) is 218.507m long, with the bridge section 159.2m long and road section 59.307m. The bridge span layout is 31+50+40+30 (m); the...