COMPANY BUSINESSES

Phase I Supporting Municipal Works for Angola Social Housing Project K. K.

Water Purification PlantThe recent production capacity is : 40,000 m³/d and the long-term production capacity is 150,000 m³/d.Sewage Treatment PlantThe production capacity of the sewage treatment plant is 35,000 m³/d. Some tail water after two-stage biological treatment is discharged into natural ditch around the sewage plant, and other (5000m³/d) is reused after deep treatment to sprinkle road and green space.

Xiagezhuang Sewage Plant

Angola Luanda Nova Centralidade de Cacuaco Project

The project in Cacuaco area of Luanda is a municipal supporting work for Angolan Luanda Nova Centralidade de Cacuaco. In long term, 30,000 residential apartments will be built, which can accommodate a total population of 210,000.In short term, 12,000 will be built, which can accommodate total population of 120,000.
Sewage Treatment PlantThe production capacity of the sewage treatment plant is 40,000 m³/d. Some tail water after two-stage biological treatment is discharged into natural ditch on ...

Reclaimed Water and Sewage Pipeline Project for Shuangqiao East Road and other 7 Roads

The reclaimed water and sewage pipeline project has been carried out for 7 roads, including Shuangqiao East Road, Heihuzhuang Street, Changying Road, Daludian North Road, Tonghuiguanqu West Road. And new pipelines for reclaimed water and sewage (including recession) have been constructed along the 7 roads. Among them, the reclaimed water pipeline starts from Dingfuzhuang Reclaimed Waterworks and ends at the south side of Fatou Sewage Treatment Plant with the pipeline length of 7468.7m and pipe di...

Reclaimed Water and Sewage Pipeline Project for Donggao Road and Other 7 Roadsin Chaoyang District of...

The reclaimed water and sewage pipeline project has been carried out for 7 roads in Chaoyang District, which are respectively Donggao Road, Magezhuang Road, Gaoantun 6th Road, Gaoantun 2nd Road, Bahenan Riverside Road, Gaoantun 1st Road, and Gaoantun 8th Road. And new pipelines for reclaimed water and sewage including recession) have been constructed along the 7 roads. Among them, the reclaimed water pipeline starts from Gaoantun Reclaimed Waterworks and ends at Dongbanan 2nd Street with the pipe...

Sewage Treatment and Trunk Project for Reclaimed Water of Beijing Central City

Beijing has launched four reclaimed water construction projects respectively at Dingfuzhuang, Huaifang, Gaoantun and Qinghe Phase II since 2013. Our institute has undertaken the design of sewage feeder trunk lines of reclaimed water plant and reclaimed water trunk project at Dingfuzhuang and Gaoantun. Among these projects, at Dingfuzhuang the pipe diameter of sewage trunk is D2000mm and the reclaimed water trunk is as long as DN1200mm, at Gaoantun the pipe diameter of sewage trunk is D2400mm and ...

Waterlogging Control Project of Concave-Down Bridge Areas in Beijing Central City

Our company has been taking up waterlogging control projects of concave-down bridge areas in Beijing central city since 2012 and we have undertaken the upgrading and reconstruction projects of the concave-down bridge areas and reservoirs of 21 bridges, such as Xiaojiahe Bridge, Gongyi East Bridge, Dahongmeng Bridge in Haidian District and Fengtai District of Beijing. In view of construction engineering land shortage and construction difficulty, the subsurface excavation method for reservoir const...

Renovation Project Rainwater and Sewage Pipe Network in Beijing Central City

Beijing has started its renovation project of central city rainwater and sewage pipe network since 2012, aiming to eliminate the hidden dangers of the old pipe network of central city and prolong its service life. For most of the projects are within the built-up area of the central city, there were no appropriate excavation conditions and thus trenchless pipeline repair and protection technology have been applied. According to the diameter, corrosion and current conditions of the existing pipelin...

Angola Luanda Cacuaco Phase-Three Waterworks Project

Under the Angola Luanda Cacuaco Phase-III Waterworks Project, there are water intake works, water purification plant works (including water treatment works and sewage treatment works), commuting road works, and power supply and extension works.The designed production capacity of water intake works is 94,500m³/d, including the structures (constructions) such as water pumping station and power distribution room, rotary scree well and suction well, as well as the process pipelines, electrical engin...

TO BE A DESIGN-LEADING
INTEGRATED SERVICE PROVIDER FOR
URBAN CONSTRUCTION